Excavation Checklist Excel Fill Online, Printable, Fillable, Blank
Excavation Inspection Form. Web excavations and protective systems inspected by competent person daily, before start of work employees protected from loose rock or soil spoils, materials, and equipment set back a minimum of two feet from edge of excavation barriers provided at all remote excavations, wells, pits, shafts, etc. Web trench / excavation inspection form (this is to be completed by the competent person for each excavation/trench and turned into the jobsite superintendent at the start of each work day and /or prior to working in the trench) date/time:
Excavation Checklist Excel Fill Online, Printable, Fillable, Blank
Employees protected from loose rock or soil. Is the depth of the cut more than 2’ below the bottom of the shield are walkways over the excavation at least 20” wide and 2’ past both edges are they equipped with guardrails? Web trenching and excavation work presents serious hazards to all workers involved. One cubic yard of soil can weigh as much as a car. Employees prohibited from working or walking under suspended loads. This instruction establishes inspection procedures and provides clarification to ensure uniform enforcement of the excavation standards. An unprotected trench can be an early grave. Web trench / excavation inspection form (this is to be completed by the competent person for each excavation/trench and turned into the jobsite superintendent at the start of each work day and /or prior to working in the trench) date/time: Walkways and bridges over excavations 6' or more in depth are at least 20 inches wide and are equipped with required guardrails. Web trench location/station and dimensions:
Web excavations and protective systems inspected by competent person daily, before start of work employees protected from loose rock or soil spoils, materials, and equipment set back a minimum of two feet from edge of excavation barriers provided at all remote excavations, wells, pits, shafts, etc. This instruction establishes inspection procedures and provides clarification to ensure uniform enforcement of the excavation standards. Web is the spoil 2’ or more from the edges of excavation does the shield extend at least 18” above surrounding areas? Web daily excavation safety inspections are ideally conducted before shift starts and, as deemed necessary, during work. Web excavations and protective systems inspected by competent person daily, before start of work employees protected from loose rock or soil spoils, materials, and equipment set back a minimum of two feet from edge of excavation barriers provided at all remote excavations, wells, pits, shafts, etc. Walkways and bridges over excavations 6' or more in depth are at least 20 inches wide and are equipped with required guardrails. Ladders placed no more than 25 feet apart. Web spoils, materials, and equipment set back a minimum of 2' from edge of excavation. Web trench / excavation inspection form (this is to be completed by the competent person for each excavation/trench and turned into the jobsite superintendent at the start of each work day and /or prior to working in the trench) date/time: Excavations and protective systems inspected by competent person daily, before start of work. Surface encumbrances supported or removed.